Pitt County · NC

Wells in Pitt County

217 recorded wells, 158 with verified depth. Here's what the drilling records say and what the permit takes.

Depth, from the records

70ft median drilled depth
p10 · 14 ftp90 · 490 ft

Eight of ten wells in Pitt County finished between 14 and 490 feet. Budget to the deep end; celebrate the shallow one.

Median reported yield: 65 gpm

Pin your exact parcel →

Who drills around here

Contractor (NC statewide)WellsMedian depth
David Simmons1830 ft
Thomas Whitehead1417 ft
David Register13207 ft
L. Martin Shaver1228 ft
LEONARD DORN JR1055 ft
Ronald Cannady8102 ft
Mark Creel710 ft
Clyde Russell6365 ft

The permit in Pitt County

Paper / PDF filingverified landing

Pitt County Environmental Health

NCGS 87-97; 15A NCAC 02C

Instrument
well construction permit
Fee
Call to confirm
Who files
Driller or owner may file
Timeline
30-day statutory decision (NCGS 87-97)

Confirm portal/fee with EH

Before the rig arrives

  1. Confirm parcel allows a private well (vs required public water connection).
  2. Select a licensed well contractor; obtain owner authorization as required.
  3. File well construction permit with Pitt County Environmental Health (PDF/email/mail — WellMap prepares the packet; lawful submitter files).
  4. Provide site plan: proposed well, septic, property lines, structures.
  5. Schedule site evaluation / sanitary survey if required.
  6. Do not drill until authorization is issued (or notification accepted, per regime).

After drilling: GW-1 Well Construction Record within 30 days → NC DEQ DWR + county copy · filing link ↗

Forms: County well permit · GW-1 Well Construction Record

WellMap prepares estimate-backed quote packets and dual-party approvals. It does not issue permits and never auto-submits to government systems. The licensed driller (and/or owner where required by law) is the submitter of record. Verified 2026-07-14.