Wells in Person County

119 recorded wells, 119 with verified depth. Here's what the drilling records say and what the permit takes.

Depth, from the records

85ft median drilled depth
p10 · 49 ftp90 · 156 ft

Eight of ten wells in Person County finished between 49 and 156 feet. Budget to the deep end; celebrate the shallow one.

Pin your exact parcel →

The permit in Person County

Files onlineverified landing

Person County Environmental Health

NCGS 87-97; 15A NCAC 02C

Instrument
well construction permit
Fee
Call to confirm
Who files
Driller or owner may file
Timeline
30-day statutory decision (NCGS 87-97)

Citizen Self-Service (vendor TBD) — confirm fee by phone

Before the rig arrives

  1. Confirm parcel allows a private well (vs required public water connection).
  2. Select a licensed well contractor; obtain owner authorization as required.
  3. File well construction permit with Person County Environmental Health (PDF/email/mail — WellMap prepares the packet; lawful submitter files).
  4. Provide site plan: proposed well, septic, property lines, structures.
  5. Schedule site evaluation / sanitary survey if required.
  6. Do not drill until authorization is issued (or notification accepted, per regime).

After drilling: GW-1 Well Construction Record within 30 days → NC DEQ DWR + county copy · filing link ↗

Forms: County private well construction / site evaluation · GW-1 Well Construction Record