Lee County · NC
Wells in Lee County
326 recorded wells, 315 with verified depth. Here's what the drilling records say and what the permit takes.
Depth, from the records
225ft median drilled depth
p10 · 89 ftp90 · 360 ft
Eight of ten wells in Lee County finished between 89 and 360 feet. Budget to the deep end; celebrate the shallow one.
The permit in Lee County
Files onlineverified portal
Lee County Environmental Health
NCGS 87-97; 15A NCAC 02C
- Instrument
- well construction permit
- Fee
- $375
- Who files
- Driller or owner may file
- Timeline
- 30-day statutory decision (NCGS 87-97)
Includes water panel; GovOS e-sign
Before the rig arrives
- Confirm parcel allows a private well (vs required public water connection).
- Select a licensed well contractor; obtain owner authorization as required.
- File well construction permit online via the authority portal (deep-link below).
- Provide site plan: proposed well, septic, property lines, structures.
- Schedule site evaluation / sanitary survey if required.
- Do not drill until authorization is issued (or notification accepted, per regime).
After drilling: GW-1 Well Construction Record within 30 days → NC DEQ DWR + county copy · filing link ↗
Forms: County private well construction / site evaluation · GW-1 Well Construction Record
WellMap prepares estimate-backed quote packets and dual-party approvals. It does not issue permits and never auto-submits to government systems. The licensed driller (and/or owner where required by law) is the submitter of record. Verified 2026-07-14.