Granville County · NC
Wells in Granville County
155 recorded wells, 155 with verified depth. Here's what the drilling records say and what the permit takes.
Depth, from the records
Eight of ten wells in Granville County finished between 51 and 165 feet. Budget to the deep end; celebrate the shallow one.
The permit in Granville County
Granville-Vance Public Health (GVPH) — Wells
NCGS 87-97; 15A NCAC 02C
- Instrument
- well construction permit
- Fee
- $400 (eff. 2025-07-16)
- Who files
- Driller or owner may file
- Timeline
- 30-day statutory decision (NCGS 87-97)
PDF/email via GVPH; fee eff 2025-07-16
Before the rig arrives
- Confirm parcel allows a private well (vs required public water connection).
- Select a licensed well contractor; obtain owner authorization as required.
- File well construction permit with Granville-Vance Public Health (GVPH) — Wells (PDF/email/mail — WellMap prepares the packet; lawful submitter files).
- Provide site plan: proposed well, septic, property lines, structures.
- Schedule site evaluation / sanitary survey if required.
- Do not drill until authorization is issued (or notification accepted, per regime).
After drilling: GW-1 Well Construction Record within 30 days → NC DEQ DWR + county copy · filing link ↗
Forms: County private well construction / site evaluation · GW-1 Well Construction Record
Authority contact: eh@gvph.org
WellMap prepares estimate-backed quote packets and dual-party approvals. It does not issue permits and never auto-submits to government systems. The licensed driller (and/or owner where required by law) is the submitter of record. Verified 2026-07-14.